OPTIMIZE AT
HV SIDE OR LV SIDE

Voltage optimization is needed to correct the supply issues
caused by the high voltage (HV) infrastructure.

Low-High-Voltage-img

If your company operates its own HV/LV (distribution) transformer then perhaps the most effective option is to install a Powerstar HV MAX system. This will produce savings on both the transformer side as well as the load side (depending on the voltage profile, business operation and type of equipment on site.) If your company has a low voltage (LV) supply only, then the Powerstar or Powerstar MAX systems will be the most appropriate.

Low-High-Voltage-img1